Decks & Fencing

Fence Installation Cost Calculator

Use the length of fence infill you intend to price, with gate openings excluded once. Compare material scenarios and review the separate gate/project allowance before treating the result as a project budget.

Make it yours

Your numbers

Start with the example below, then adjust it to your home.

ft
selection
selection
selection
selection

Bundled May 2025 BLS state/territory employee wages. No ZIP lookup, live request, or local material-price adjustment.

Assumptions and overrides
×

Illustrative wage-related cost multiplier.

%

Applied to materials, supplies, burdened labor, and fixed allowances. Not profit margin.

selection
Your numbers stay in your browser.
A clearer picture

Base fence installation estimate

$4,343.31
Priced net fence infill
150 ft
25th-percentile wage scenario
$4,082.09
75th-percentile wage scenario
$4,493.16
Base cost per priced foot
$28.96 / ft
Fence infill material allowance
$1,800.00
Posts, hardware and concrete allowance
$450.00
Modeled installation labor
22.5 person-hours
Base employee wage
$25.02 / hour
Base burdened labor
$844.43
Combined fixed project allowance
$525.00
Base subtotal before markup
$3,619.43
Base contractor markup
$723.89
Updates as you adjust your numbers

An estimate, not a quote. Example rates are adjustable. See the assumptions below.

Estimate basis

Wage basis: United States; BLS OEWS May 2025, Construction Laborers (47-2061).

Wage data retrieved 2026-11-16; reference allowances observed 2026-11-17. Material prices, hours, fees, burden, and markup are editable illustrative planning assumptions, not surveyed current local prices.

Lower/base/higher vary employee wages and their markup only. Base uses the mean, not median; the other scenarios use occupational P25/P75. These are not confidence intervals or contractor-bid ranges.

Priced length is net infill, excluding gate openings; no hidden four-foot gate deduction is made. Reference fixed scope includes one gate, auger rental, permits and cleanup. For another gate scope, enter an explicit combined fixed allowance. Posts/hardware/concrete are already in the per-foot allowance and are not added again from quantities.

Reference fence height and detailed product specification are not established. These are unspecified planning allowances requiring a matching quote, not accurate prices for every height. Removal, rock, surveys, major grading, specialized access and pool-barrier certification are excluded unless expressly priced.

Comparison rows use the same physical quantity, quality, wage geography, burden and markup. Only recovered material-specific coefficients change; location does not alter material prices.

Compare fence materials

Same priced net infill length, quality, employee wage basis, burden and markup. Custom allowances apply equally to each row; product height and site scope still require a quote.

Modeled fence totals for the same priced infill length
MaterialLower wageBaseHigher wage
Wood privacy$4,082.09$4,343.31$4,493.16
Chain link$2,631.39$2,805.54$2,905.44
Vinyl$5,041.67$5,250.65$5,370.53
Aluminum$5,731.67$5,940.65$6,060.53
Behind the numbers

How this calculator works

Primary material = physical quantity × selected material rate. Hardware = quantity × hardware rate. Person-hours = quantity × productivity. Each labor scenario = hours × employee wage × burden. Subtotal = material + hardware + burdened labor + combined fixed allowance. Markup = subtotal × markup/100; total = subtotal + markup. Unit cost = total / physical quantity. No waste-expanded purchase quantities or duplicate material charges are added.

A worked example

For exactly 150 priced feet of mid-range wood privacy, materials are $1,800, hardware $450, labor 22.5 person-hours and fixed scope $525. Manual May 2024 construction-laborer wages $18.85/$23.31/$26.81, 1.5 burden and 20% markup give $4,093.43 / $4,274.06 / $4,415.81. Base labor stays unrounded at $786.7125; subtotal $3,561.7125; total $4,274.055 rounds to $4,274.06. Same-length mid-range chain-link/vinyl/aluminum base totals are $2,759.37 / $5,195.24 / $5,885.24. Production defaults instead use bundled May 2025 wages.

Assumptions & what’s included

  • Recovered Basic/Mid-range/Premium material rates ($/ft): wood privacy 7/12/20; chain link 4/7/10; vinyl 12/18/28; aluminum 15/22/35. Hardware/posts/concrete rates are 3/2/2.5/2; person-hours/ft 0.15/0.10/0.12/0.12; combined fixed fees 525/425/625/675. Only the material rate changes with quality. Labor uses Construction Laborers (SOC 47-2061), not deck carpenter wages.
  • The source names one gate, auger rental, permits and cleanup as fixed scope; only combined totals are confidently mapped to the recovered arrays. No unsupported per-item allocation is claimed. For no gate or additional gates, enter a project-specific combined allowance; do not multiply all fixed costs by gate count. Quantity-tool gate posts/concrete are not added on top of already included hardware allowances.
  • Exactly 150 priced feet means 150 feet in the formula, not 146 after a hidden gate deduction. Transfer declared net infill from Fence, then reconcile the separately included gate scope. General fence height and product specifications are unrecovered; these are unspecified planning allowances requiring matching quotes, not a height-aware pricing model.
  • Removal, difficult excavation, rock, surveys, major grading, specialized access and pool-barrier certification are excluded unless explicitly quoted. No property-boundary, installation, permit-height or structural approval is supplied.
  • Reference allowances were observed November 17, 2026; they are planning coefficients, not surveyed current local prices. Default wages use verified bundled BLS OEWS May 2025 employee P25/mean/P75, not May 2024 historical fixture wages. The mean is not the median and can fall outside the two percentiles; values are not reordered.
  • The existing state/territory selector changes employee wages only. It does not localize materials, productivity, permits, climate or site conditions. Missing/suppressed occupation data get a disclosed complete national fallback, never zero wages. Manual wages are unverified assumptions. There is no ZIP lookup, prefix-based localization or asynchronous request to become stale after reset.
  • Employee wages are not contractor billing rates. Burden defaults to 1.5 and markup to 20% of materials, hardware, burdened labor and fixed fees. Do not burden an already all-in quote again. Markup is not margin; person-hours are not multiplied by a crew factor. Fixed project allowances apply once and prevent the whole estimate from scaling linearly with area or length.
  • Quantity calculations retain precision until display. Whole purchases round upward without subtracting an epsilon. Money uses the site's existing cents rounding (a positive half-cent such as 4274.055 displays 4274.06); intermediate quantities, labor and markup are not rounded to force totals. Displayed line items can differ by a cent from the rounded total. Original input measurements, not rounded result displays, should be used for manual transfers.

A few common questions

Should I enter the whole property line including gates?

Enter priced net fence infill. If measuring an overall path, deduct actual gate openings once using a consistent measurement convention. The separate fixed allowance includes one example gate; adjust it for the real gate scope.

Does the same rate apply at every fence height?

No. The reference's detailed height specification is unavailable. Replace the planning allowances with height- and product-matched quotes; this tool does not invent a general height multiplier.