Kitchen & Bath Remodels

Kitchen Remodel Cost Calculator

Build a kitchen planning budget from floor area, scope, and finish quality. Use published employee wage data alongside clearly labeled illustrative allowances, then adjust the assumptions to your project.

Make it yours

Your numbers

Start with the example below, then adjust it to your home.

sq ft

Floor area of the room. This is a scope-based planning model, not a measured bill of materials.

selection
selection
area

BLS May 2025 state/territory employee wages. No ZIP lookup or city-level pricing. Only labor and its markup vary by area.

Assumptions and overrides
×

Illustrative wage-related costs multiplier; 1.5 means 50% above employee wages.

%

Applied to materials, burdened labor, and fixed allowances. This is markup, not profit margin.

selection

Switch to custom to edit the current preset. Custom values stay in use until you switch back; scope/material changes do not overwrite them.

Your numbers stay in your browser.
A clearer picture

Base planning estimate

$23,760.63
Lower wage scenario
$21,541.50
Higher wage scenario
$25,137.90
Base installed cost
$158.40 / sq ft
Materials
$12,000.00
Installation labor
150 person-hours
Base employee wage
$30.67 / hour
Base burdened labor
$6,900.53
Fixed allowances total
$900.00
Permit allowance
$300.00
Dumpster allowance
$400.00
Design/planning
$0.00
Appliance delivery
$200.00
Base subtotal before markup
$19,800.53
Base contractor markup
$3,960.11
Updates as you adjust your numbers

An estimate, not a quote. Example rates are adjustable. See the assumptions below.

Estimate basis

Wage basis: United States, May 2025 BLS OEWS employee data. National estimates, not ZIP-level contractor quotes.

Data retrieved 2026-11-16; illustrative allowance assumptions observed 2026-11-16. Material, productivity, and fixed allowances are illustrative presets, not measured local prices. Edit them under Assumptions and overrides.

Lower/base/higher wage scenarios change labor and its markup only. The base uses mean wages, not median wages; lower/higher use weighted trade 25th/75th-percentile wages, not percentiles of project bids. These are not confidence bounds or a full range of contractor bids.

Behind the numbers

How this calculator works

Materials = area × material allowance per sq ft. Person-hours = area × hours per sq ft. Labor = unrounded person-hours × employee hourly wage × burden multiplier. Subtotal = materials + labor + fixed allowances. Markup = subtotal × markup percentage ÷ 100. Total = subtotal + markup. Cost per square foot = unrounded total ÷ entered area. The three scenarios change only the wage input.

A worked example

Using manual illustrative wages of $19.50 / $26.20 / $31.00 per hour, a 150 sq ft Standard, Mid-Range kitchen has $12,000 materials, 150 person-hours, and $900 fixed allowances. At 1.5× burden and 20% markup, the three totals are $20,745.00 / $22,554.00 / $23,850.00. These manual wages are reference fixtures, not the current bundled BLS defaults.

Assumptions & what’s included

  • Cosmetic represents limited surface and fixture updates. Standard represents counters, backsplash, appliances, and cabinet refinishing; it does not promise all-new cabinets. Full Gut is a broader replacement allowance, not a guarantee that every renovation item is included.
  • Fixed presets: Cosmetic $0; Standard permits $300, dumpster $400, appliance delivery $200; Full Gut permits $600, dumpster $600, design/planning $1,200, appliance delivery $300. Location changes wages only, not these fees.
  • The wage blend is 35% carpenters, 15% plumbers, 15% electricians, 15% construction laborers, 10% tile/stone setters, and 10% painters. These weights and person-hours per square foot are model assumptions, not observed staffing for your job.
  • Structural changes, concealed damage, hazardous-material remediation, major utility relocation, and specialty installations are not separately modeled. Do not add a countertop estimate to a kitchen allowance that already includes counters without removing that overlap.
  • This is an area-based planning model. Materials, labor productivity, fixed allowances, 1.5× wage burden, and 20% markup are editable illustrative assumptions observed in a reference model on November 16, 2026, not government-prescribed costs or independently measured market prices.
  • Wages are bundled BLS OEWS May 2025 employee hourly data, retrieved November 16, 2026. State estimates are not city or ZIP estimates. No live pricing API is used. If any required trade is missing or suppressed, the entire wage blend falls back to United States data and the result explicitly says so. Manual employee wages are available.
  • Lower/base/higher scenarios vary only employee wages. Base uses weighted means, not medians; lower/higher use weighted occupational 25th/75th percentiles, not project-cost percentiles. A mean may lie outside those two percentiles. These scenarios do not capture all uncertainty or the spread of contractor bids.
  • Burden is applied to wages; contractor markup is then applied to materials, burdened labor, and fixed allowances. Do not enter an all-in contractor billing rate as an employee wage without removing costs already included. Markup is not the same as profit margin.
  • All measurements use square feet, person-hours, and US dollars. Calculation keeps full precision; display rounds money to cents and measured results to two decimals. Individually rounded lines may differ by a cent from their rounded sum.
  • No sales tax, contingency, financing, temporary accommodation, or unlisted delivery fees are added. The listed permit and disposal allowances are planning entries, not statements of local rules or actual fees. Add excluded expenses separately to your project budget.

A few common questions

Does this give a local contractor quote?

No. The state selector uses May 2025 BLS employee wage estimates, not contractor billing rates or ZIP prices. Materials, productivity, fees, burden, and markup remain illustrative assumptions. Get written quotes for your exact scope and check exclusions.

Why is the base estimate different from mid-range finishes?

Mid-Range is a material-quality selection. The base estimate uses mean employee wages (or your manual base wage). It is not the median bid or a middle finish package, and it need not fall between the other two wage scenarios.

Can I replace the preset allowances?

Yes. Open Assumptions and overrides and choose Custom allowances to copy and edit the selected preset. Zero is a valid entered allowance; a missing active value is an error. Reset restores the original selections, national wage basis, and presets.

Are tax and contingency included?

No. Neither is silently added. Build a separate allowance for excluded tax, uncertainty, and project-specific expenses, and check whether your supplier or contractor already includes them.