Kitchen & Bath Remodels

Build a kitchen or bathroom budget without counting costs twice

Separate scope, material allowances, employee wages, fixed expenses, and markup when planning a kitchen, bathroom, or countertop project and comparing quotes.

Start with a written scope, separate materials from labor, and check what each quote already includes. An area-based calculator can help organize an early budget, but it cannot inspect concealed damage, specify a cabinet package, or predict a contractor's bid.

The kitchen remodel calculator, bathroom remodel calculator, and countertop calculator share a transparent model. Their material, productivity, and fixed-cost presets are illustrative planning allowances, not surveyed local prices. Their wage selector uses a bundled May 2025 BLS employee-wage snapshot, retrieved November 16, 2026. These dates describe the evidence; they do not make the estimates current quotes.

Choose a scope before a finish tier

A cosmetic refresh and a full replacement involve different work. List what stays, what changes, and who handles removal and disposal. In our kitchen model, Standard includes an allowance for cabinet refinishing, not an automatic all-new cabinet purchase. Full Gut is a broader allowance, not a promise that structural alterations, major utility relocation, or every hidden problem is covered.

Finish quality changes the material allowance. It does not change the meaning of the base wage estimate. “Mid-Range” finishes and the “base” result answer different questions: one selects a material tier, while the other uses mean employee wages or your manual base-wage assumption.

Measure the right area. Kitchen and bathroom models use floor area. Countertops use the actual countertop surface. A 150-square-foot kitchen does not imply 150 square feet of counters.

Separate wages, burden, and markup

BLS OEWS describes employee wages. It does not provide an all-in contractor billing rate for your address. The calculator first multiplies person-hours by an employee wage and an editable burden multiplier. It then adds materials and fixed allowances, and applies contractor markup to that subtotal.

The default burden of 1.5 and markup of 20% are model assumptions, not BLS recommendations. Entering an already loaded contractor rate while keeping both adjustments can count some costs twice. If you have a complete installation quote, compare its scope directly with the model rather than treating the quote as an employee hourly wage.

Lower and higher wage scenarios change only labor and its markup. They are not a confidence interval or the expected spread of real bids. For blended crews, weighted occupational percentiles are scenario inputs; they are not percentiles of the combined project's cost. A mean can fall outside the 25th-to-75th-percentile interval.

Work one example at full precision

For an arithmetic example, take 35 square feet of granite countertop with a hypothetical $50-per-square-foot material/fabrication allowance, 0.15 person-hours per square foot, $600 in fixed allowances, and a manually entered $27.30 employee wage. None of these dollar inputs is presented as a current local quote.

Component Illustrative arithmetic
Material and fabrication 35 × $50 = $1,750
Person-hours 35 × 0.15 = 5.25
Labor with 1.5× burden 5.25 × $27.30 × 1.5 = $214.9875
Subtotal with fixed allowances $1,750 + $214.9875 + $600 = $2,564.9875
Markup at 20% $512.9975
Total $3,077.985, displayed as $3,077.99

Keep 5.25 hours in the labor calculation; using a rounded 5.3 hours changes the answer. Calculate cost per square foot from the unrounded total and the actual surface area. The model rounds money only for display, so adding individually rounded rows can differ by a cent.

Check for overlapping allowances

A material package can include fabrication and a standard edge. An installation quote might also include removal, a sink cutout, or plumbing reconnection. Ask the supplier to identify those inclusions before adding another allowance for them.

Likewise, do not add a standalone countertop total to a kitchen budget that already includes counters. Decide whether the standalone tool replaces a line in the larger budget or describes a genuinely additional project. A bathroom vanity allowance may already contain its countertop.

For separate work, the flooring calculator helps with whole-box quantities and the paint calculator helps with wall coverage. Keep those costs outside a remodel allowance only when they are outside that allowance's scope.

Turn the model into a project budget

Use the state selector as a wage basis, not an address-level price lookup. The tools do not map ZIP codes. Where a required trade is missing or suppressed, the result explicitly identifies the national fallback. Manual employee wages are available when you have a better documented assumption.

Open Assumptions and overrides to replace illustrative inputs. Zero is valid for an expense that does not apply; a blank active field means information is missing. Custom allowances remain in use until you switch back to presets or reset. For countertop comparison, the same custom allowances apply to all material rows, so identical results can be intentional.

Keep a separate list of items not included: sales tax, contingency, financing, temporary accommodation, specialized fixtures, structural work, concealed damage, and unlisted delivery costs. Obtain itemized quotes and qualified assessments where needed. Verify actual permit and disposal requirements locally; a calculator's fee allowance does not establish what your jurisdiction requires.

Sources & further reading

For general information and planning only. Examples are illustrative, and your costs will differ. Read our disclaimer.