Asphalt Calculator
Measure the finished paving area and thickness, then use a compatible material density to estimate volume and tonnage. Keep ordering allowance and the scope of your entered price explicit.
Your numbers
Start with the example below, then adjust it to your home.
Allowance-adjusted asphalt weight
- Finished paving area
- 200 sq ft
- Net installed volume
- 33.33 cu ft
- Net installed volume
- 1.23 cu yd
- Net installed weight
- 2.44 US short tons
- Net installed weight
- 4,888.89 lb
- Allowance-adjusted equivalent volume
- 36.67 cu ft
- Allowance-adjusted equivalent volume
- 1.36 cu yd
- Allowance-adjusted equivalent volume
- 1.04 cu m
- Allowance-adjusted weight
- 5,377.78 lb
- Allowance-adjusted metric weight
- 2.44 metric tonnes
- Density at finished condition
- 3,960 lb / cu yd
- Ordering allowance
- 10 %
- Entered-rate subtotal — see selected scope
- $336.11
An estimate, not a quote. Example rates are adjustable. See the assumptions below.
Estimate basis
Entered-rate subtotal is supply only under your stated assumption. Labor, hauling, delivery fees, minimums, tax, and other work are not added.
Reference densities (hot mix 3,960; cold patch 3,500 lb/cu yd) are examples for the entered finished condition. Verify a compatible density and project quote. Ordering allowance is not a physical compaction conversion; adjusted volume is an equivalent volume at that density, not loose truck-bed volume.
Mass is unrounded before pricing. US short tons are 2,000 lb; metric tonnes are 1,000 kg. No whole-ton ordering increment, bag yield, truck capacity, or delivery fee is invented.
How this calculator works
Net ft³ = area × finished thickness in inches / 12. Net yd³ = net ft³ / 27. Net lb = net yd³ × compatible lb/yd³ density; US short tons = lb / 2,000. Multiply net volume and mass once by (1 + allowance/100). Entered-rate subtotal = unrounded adjusted short tons × entered $/short ton. Metric tonnes = lb × 0.45359237 / 1,000.
For 20 × 10 ft at 2 inches, net volume is 33.33333333 cu ft, or 1.23456790 cu yd. At the example 3,960 lb/cu yd density, net mass is 2.44444444 short tons. A 10% ordering allowance produces 1.35802469 cu yd and 2.68888889 short tons (5,377.77777778 lb). At an illustrative $125/short ton, the entered-rate subtotal is $336.11, using unrounded mass.
Assumptions & what’s included
- Rectangle area is length × width; circle area uses the full π constant and the entered diameter, not radius. Known area replaces hidden dimensions. Measurements describe finished project area including applicable joints; purchasing allowance does not enlarge the installed project.
- Hot-mix 3,960 and cold-patch 3,500 lb/cu yd are reference density examples, not universal mix properties. Finished thickness and density must refer to compatible material conditions. No blanket 25% compaction factor is added. Adjusted volume is equivalent volume at that density, not loose truck-bed volume.
- The reference relates $125/ton to a furnished-and-laid price; it does not verify a supply-only market price. Here $125 is an illustrative editable assumption. Select whether your entered rate is supply only or includes installation. Cold patch requires its own rate; no bag yield or hot-mix price is silently substituted.
- Full precision is retained until display. Currency rounds to cents, other quantities to at most two decimals, and whole purchases round upward from unrounded demand. Example prices and densities are editable assumptions, not verified current local quotes. No delivery minimum, tax, or hidden purchasing increment is added.
Data and allowance sources
A few common questions
Should I round the result to whole tons?
Only if your supplier sells in that increment. This tool keeps fractional tonnage and prices the unrounded quantity. Confirm order increments, minimums, and delivery separately.
Can I add this subtotal to the driveway cost result?
No automatic addition is appropriate. The driveway model already includes an area-based material allowance and paving labor. An installation-inclusive ton price can overlap both; compare and reconcile the quote's scope first.