Window Replacement Cost Calculator
Estimate a project using one window type and quality for every entered window. Separate the material allowance, installation labor, and project fees before comparing wage scenarios.
Your numbers
Start with the example below, then adjust it to your home.
Base planning estimate
- Lower wage scenario
- $4,931.62
- Higher wage scenario
- $5,323.87
- Base cost per unit
- $646.08 / window
- Materials
- $3,200.00
- Supplies allowance
- $0.00
- Installation labor
- 16 person-hours
- Base employee wage
- $31.55 / hour
- Base burdened labor
- $757.20
- Fixed allowances total
- $350.00
- Base subtotal before markup
- $4,307.20
- Base contractor markup
- $861.44
- Permit allowance (once)
- $150.00
- All windows: disposal allowance
- $200.00
An estimate, not a quote. Example rates are adjustable. See the assumptions below.
Estimate basis
Wage basis: United States; BLS OEWS May 2025, Carpenters (47-2031).
Wage data retrieved 2026-11-16; reference allowances observed 2026-11-16. Material prices, hours, fees, burden, and markup are editable illustrative planning assumptions, not surveyed current local prices.
Lower/base/higher vary employee wages and their markup only. Base uses the mean, not median; the other scenarios use occupational P25/P75. These are not confidence intervals or contractor-bid ranges.
How this calculator works
Materials = whole window count × dollars per window. Person-hours = count × hours per window. Fixed costs = one project permit allowance + count × disposal per window. Labor = person-hours × carpenter employee wage × burden. Total = (materials + labor + fixed costs) × (1 + markup percent / 100). Per-window cost = unrounded total / count.
Eight Mid-Range Double-Hung windows: $3,200 materials, 16 person-hours, and $350 fixed allowances. Manual reference wages $21.77 / $27.30 / $31.75, 1.5× burden, and 20% markup give $4,886.98 / $5,046.24 / $5,174.40. One identical window gives a base $788.28 because the $150 permit allowance is still charged once. Bundled BLS defaults use a different, identified wage release.
Assumptions & what’s included
- All windows use the selected type/quality. Basic / Mid-Range / Premium material allowances per window: Single-Hung $150 / $300 / $550; Double-Hung $200 / $400 / $700; Casement $225 / $450 / $800; Picture/Fixed $175 / $350 / $650. Person-hours respectively: 1.5 / 2 / 2 / 1.25. Permit $150 per project; disposal $25 per window.
- Structural enlargement, custom sizes, concealed frame damage, hazardous-material work, and specialized access are excluded. This does not price every full-frame replacement or mixed-window schedule.
- Wages are employee hourly data from BLS OEWS May 2025, retrieved November 16, 2026. State/territory selections are not ZIP or city estimates and do not change material prices. Missing or suppressed occupation data falls back to the entire national wage series with an explicit notice. Manual employee wages remain available.
- Lower/base/higher vary only wages: occupational P25, mean, and P75. The mean is not a median and may fall outside the percentiles; scenarios are neither confidence intervals nor the full range of bids. Burden multiplies employee wages; markup then applies to the subtotal. Do not enter an all-in contractor rate as a wage.
- No tax, contingency, financing, or unlisted delivery is added. Fixed allowances are editable budgets, not local permit requirements or estimates for hazardous-material work. Project quantity must be positive, even if fixed fees have been entered.
- Dimensions are normalized to feet and square feet; changing display units preserves the physical measurement. Inputs have explicit finite limits. Missing active inputs are errors, while an explicitly entered zero price is valid.
- Full precision is retained until display. Money displays to cents using half-up rounding for these nonnegative costs; individually rounded lines may differ by a cent from their sum. Discrete purchases round upward before display, without subtracting an epsilon. Siding squares remain an area measure.
- Defaults and reference price, weight, productivity, burden, markup, and fee allowances are adjustable examples observed November 16, 2026, not verified current supplier prices or universal recommendations. Confirm product labels, scope, and written quotes before ordering.
A few common questions
Does selecting a state change window prices?
No. It selects carpenter employee wage data. Material allowances, productivity, and fees remain illustrative until you replace them with project evidence.
Can I mix window styles in one estimate?
This model uses one style and quality for the entered count. Estimate different groups separately and reconcile project-level fees so they are not charged repeatedly.